Open for bids -

Design system

Every component below is the real partial, rendered with representative data. Switch theme, colour mode and language in the header -- all of it re-renders from tokens, with no build step and no second RTL stylesheet.

01 — Foundation

Semantic tokens

Each theme redefines six primitive numbers (brand lightness, chroma and hue, for two brand colours). Every token below is derived from those, which is why adding a theme costs about ten lines of CSS.

--accent
--accent-2
--accent-subtle
--surface-base
--surface-raised
--surface-sunken
--success
--warning
--danger
--info
--tier-institution
--money-escrow

Themes

Domain state tokens

Every project status maps to one token, so a status pill is one class.

Draft In review Open for bids Closing soon Bidding closed Shortlisting Awarded In progress Delivered Approved Completed & paid Disputed Cancelled Expired

Verification tiers

Unverified Identity Verified Student KFUPM confirmed
02 — Typography

Two scripts, matched metrics

Inter for Latin, IBM Plex Sans Arabic for Arabic body, Noto Kufi Arabic for Arabic display. Arabic gets more leading and a 3% optical bump -- without it, Arabic reads cramped beside Latin at the same nominal size.

display / Noto Kufi Arabic 800
اكسب خبرة حقيقية
display / Inter 800
Earn real experience
tabular numerals: money never jitters
1,250.00 SAR
11,000.00 SAR
777.50 SAR
bidi isolation with bdi

مشروع React Native في الرياض — الموعد 2026-09-14.

03 — Foundation components

Controls

Built once, consumed everywhere. Directional icons mirror; clocks and checkmarks do not.

buttons
arrows mirror via scaleX(var(--dir))
inputs, switch, rating, chips
Sealed bids
4.8(12)
Python Figma تحليل بيانات
Payout sent
1,770.00 SAR · ref 884213
!
Bidding closes in 4 hours
3 applicants so far
×
Verification required
Verified Student status needed to apply
Every rule above uses margin-inline, inset-inline and text-align:start. There is no second RTL stylesheet -- flipping dir on the html element is the whole implementation, and a pre-commit hook fails the build on a physical direction property.
04 — Student view

The project board

The hottest read path in the product: keyset pagination, partial indexes, live closing countdowns, and an explainable match band rather than a raw score.

Remote × 1,000–5,000 SAR × Verified companies ×
TS
Tamween Solutions
CR Riyadh
Open for bids

Inventory dashboard for a retail chain

Clean 18 months of POS exports and build an interactive dashboard covering stock turnover, dead stock and reorder points across 14 branches.

Python Power BI SQL
4,500SAR
3 milestones · 21 days
Strong fit
closes in 5 days, 11 hours
ND
Nuqta Design House
Partner Jeddah
Closing soon

Bilingual brand kit for a coffee startup

Logo, Arabic and Latin lockups, packaging mockups and a one-page brand guideline. Arabic typography quality is the main criterion.

Illustrator Arabic type Branding
2,000SAR
2 milestones · 14 days
Good fit
closes in 13 hours, 59 minutes
MU
Majmaa Utilities
CR Dammam · onsite
Team of 3

Field survey app prototype (team project)

Offline-first mobile prototype for meter readings. Targeted to Eastern Province engineering students, year 3 and above.

Flutter SQLite
12,000SAR
4 milestones · 45 days
Strong fit
closes in 3 hours, 39 minutes
AH
Alhaya Medical Group
CR Riyadh
Not open to you

Patient-flow analysis for two clinics

Hard-filtered projects stay visible with the exact reason. Silent exclusion generates support tickets and resentment.

Requires College of Medicine or Public Health · your major is Computer Science
6,000SAR
3 milestones · 30 days
05 — Company view

Applicant workspace

Sealed until bidding closes, then ranked by match score. New students show a badge instead of a rating, so one bad first client cannot end a career.

PRJ-2026-00147
8 applicants, bidding closed 2h ago
StudentUniversity RatingMatch Status
عب
Abdullah A.
CS · Year 4
KFUPM 4.9 (14)
96% on time
94 Shortlisting
نو
Noura M.
Data Science · Year 3
KSU 4.7 (6)
100% on time
88 Shortlisting
فه
Fahad S.
IS · Year 2
PSU New
score hidden until 3 projects
71 submitted
TM
Team Ithra (3)
40 / 35 / 25 split
IAU + KFUPM 4.6 (9)
92% on time
82 submitted
06 — Money

Escrow, fees and milestones

Both sides see the exact breakdown before committing. The figures here are computed by the real helpers in apps/common/money.py, so this cannot drift from the actual fee arithmetic.

MoneyBreakdown · student view
Project budget Amount (SAR)
Contract value2,000.00
Platform commission (10%) −200.00
VAT on commission (15.00%) −30.00
Net to you1,770.00

Property tested: for any budget and any team split up to ten members, the payouts plus fee plus VAT equal the budget exactly.

Completed this month
37
+23%
GMV
148k
SAR
Take rate
9.4%
after promos
Fill rate
71%
target 65%
Dispute rate
2.1%
under 3%
Ledger discrepancies
0
reconciled 04:00
MilestoneTimeline · CTR-2026-00092
Paid out Paid 15 Jul

Profiled exports, agreed the model.

2. Dashboard build

1,800.00 SAR
Waiting for review Auto-approves 6 Aug

All fourteen branches, with the reorder-point logic.

3. Handover & training

1,350.00 SAR
Not funded yet Due 19 Aug

Walkthrough and a short written guide.

07 — The viral loop

Experience certificate

Issued automatically the moment the company approves and the payout releases. One page, side-by-side bilingual, unique serial, and a QR pointing at an unguessable public verification URL. Each column pins its own direction, so the certificate does not follow the page locale.

خِبرة
KHEBRAH
KHB-2026-7F3A-91C4

Certificate of Experience

This certifies that

Abdullah A. Alqahtani

Computer Science, Year 4
King Fahd University of Petroleum & Minerals

successfully completed the project
“Inventory dashboard for a retail chain”
for Tamween Solutions.

PythonPower BISQL

12 Aug 2026 → 20 Sep 2026 · 3 milestones · rated 5.0 / 5.0

شهادة خبرة

تشهد المنصّة بأن

عبدالله عبدالعزيز القحطاني

علوم الحاسب، السنة الرابعة
جامعة الملك فهد للبترول والمعادن

قد أكمل بنجاح مشروع
«لوحة مأشرات مخزون لسلسلة تجزئة»
لصالح شركة تموين للحلول.

بايثونباور بي آيSQL

من ١٢ أغسطس ٢٠٢٦ إلى ٢٠ سبتمبر ٢٠٢٦ · التقييم ٥٫٠‏
على 3 مرحلة · تقييم الجهة الطالبة 5.0 من 5

Verify at khebrah.sa/verify
SHA-256 4a91c7e2…8f30
Verified 14 times
08 — Edge states

Nothing here yet

Empty states are part of the design, not an afterthought.

No projects match your filters

Try widening the budget range or clearing the region filter. New projects are posted every day.